Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
48.3%
OF COST SPENT
₹399.23 Cr spent
of ₹825.98 Cr sanctioned
₹426.75 Cr still to spend
on 26,450 ongoing works
Works ongoing
26,450
Open the list of these works →
Sanctioned
₹825.98 Cr
Pure scheme (wage + material)
Expenditure since inception
₹399.23 Cr
48.3% of sanction
Balance cost (unspent)
₹426.75 Cr
Wage₹121.68 Cr
Material₹305.07 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L