Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.3%
OF COST SPENT
₹21.25 L spent
of ₹63.05 Cr sanctioned
₹62.84 Cr still to spend
on 199 ongoing works
Works ongoing
199
Open the list of these works →
Sanctioned
₹63.05 Cr
Pure scheme (wage + material)
Expenditure since inception
₹21.25 L
0.3% of sanction
Balance cost (unspent)
₹62.84 Cr
Wage₹24.22 Cr
Material₹38.62 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Bhind — Bhind ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore