Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Bund
33.6%
OF COST SPENT
₹2.12 Cr spent
of ₹6.30 Cr sanctioned
₹4.18 Cr still to spend
on 144 ongoing works
Works ongoing
144
Open the list of these works →
Sanctioned
₹6.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.12 Cr
33.6% of sanction
Balance cost (unspent)
₹4.18 Cr
Wage₹2.93 Cr
Material₹1.25 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block