Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Canal
77.5%
OF COST SPENT
₹4.33 L spent
of ₹5.59 L sanctioned
₹1.26 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹5.59 L
Pure scheme (wage + material)
Expenditure since inception
₹4.33 L
77.5% of sanction
Balance cost (unspent)
₹1.26 L
Wage₹11,431
Material₹1.14 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh