Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
50.1%
OF COST SPENT
₹302.02 Cr spent
of ₹603.22 Cr sanctioned
₹301.20 Cr still to spend
on 6,969 ongoing works
Works ongoing
6,969
Open the list of these works →
Sanctioned
₹603.22 Cr
Pure scheme (wage + material)
Expenditure since inception
₹302.02 Cr
50.1% of sanction
Balance cost (unspent)
₹301.20 Cr
Wage₹139.35 Cr
Material₹161.85 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore