Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
40.2%
OF COST SPENT
₹36.95 Cr spent
of ₹92.02 Cr sanctioned
₹55.07 Cr still to spend
on 13,365 ongoing works
Works ongoing
13,365
Open the list of these works →
Sanctioned
₹92.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹36.95 Cr
40.2% of sanction
Balance cost (unspent)
₹55.07 Cr
Wage₹31.63 Cr
Material₹23.43 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore