Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Gabion
25.9%
OF COST SPENT
₹11.22 L spent
of ₹43.41 L sanctioned
₹32.19 L still to spend
on 30 ongoing works
Works ongoing
30
Open the list of these works →
Sanctioned
₹43.41 L
Pure scheme (wage + material)
Expenditure since inception
₹11.22 L
25.9% of sanction
Balance cost (unspent)
₹32.19 L
Wage₹11.90 L
Material₹20.29 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh