Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
13.6%
OF COST SPENT
₹2.93 L spent
of ₹21.58 L sanctioned
₹18.65 L still to spend
on 34 ongoing works
Works ongoing
34
Open the list of these works →
Sanctioned
₹21.58 L
Pure scheme (wage + material)
Expenditure since inception
₹2.93 L
13.6% of sanction
Balance cost (unspent)
₹18.65 L
Wage₹14.90 L
Material₹3.75 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh