Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Spur
35.9%
OF COST SPENT
₹51.86 L spent
of ₹1.44 Cr sanctioned
₹92.52 L still to spend
on 19 ongoing works
Works ongoing
19
Open the list of these works →
Sanctioned
₹1.44 Cr
Pure scheme (wage + material)
Expenditure since inception
₹51.86 L
35.9% of sanction
Balance cost (unspent)
₹92.52 L
Wage₹47.89 L
Material₹44.63 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh