Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
1.1%
OF COST SPENT
₹1.63 L spent
of ₹1.44 Cr sanctioned
₹1.42 Cr still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹1.44 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.63 L
1.1% of sanction
Balance cost (unspent)
₹1.42 Cr
Wage₹74.49 L
Material₹67.89 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh