Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
64.7%
OF COST SPENT
₹3.32 Cr spent
of ₹5.13 Cr sanctioned
₹1.81 Cr still to spend
on 67 ongoing works
Works ongoing
67
Open the list of these works →
Sanctioned
₹5.13 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.32 Cr
64.7% of sanction
Balance cost (unspent)
₹1.81 Cr
Wage₹65.79 L
Material₹1.15 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown