Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
61.3%
OF COST SPENT
₹15.38 Cr spent
of ₹25.10 Cr sanctioned
₹9.72 Cr still to spend
on 114 ongoing works
Works ongoing
114
Open the list of these works →
Sanctioned
₹25.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹15.38 Cr
61.3% of sanction
Balance cost (unspent)
₹9.72 Cr
Wage₹3.64 Cr
Material₹6.08 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore