Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of GP Bhawan
33.8%
OF COST SPENT
₹1.88 Cr spent
of ₹5.54 Cr sanctioned
₹3.67 Cr still to spend
on 57 ongoing works
Works ongoing
57
Open the list of these works →
Sanctioned
₹5.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.88 Cr
33.8% of sanction
Balance cost (unspent)
₹3.67 Cr
Wage₹83.21 L
Material₹2.84 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore