Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
53.6%
OF COST SPENT
₹1.04 Cr spent
of ₹1.93 Cr sanctioned
₹89.73 L still to spend
on 336 ongoing works
Works ongoing
336
Open the list of these works →
Sanctioned
₹1.93 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.04 Cr
53.6% of sanction
Balance cost (unspent)
₹89.73 L
Wage₹80.77 L
Material₹8.97 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh