Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
49.5%
OF COST SPENT
₹3.18 Cr spent
of ₹6.41 Cr sanctioned
₹3.24 Cr still to spend
on 78 ongoing works
Works ongoing
78
Open the list of these works →
Sanctioned
₹6.41 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.18 Cr
49.5% of sanction
Balance cost (unspent)
₹3.24 Cr
Wage₹2.33 Cr
Material₹90.52 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore