Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Percolation Tank
0.2%
OF COST SPENT
₹5.42 L spent
of ₹29.51 Cr sanctioned
₹29.46 Cr still to spend
on 210 ongoing works
Works ongoing
210
Open the list of these works →
Sanctioned
₹29.51 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.42 L
0.2% of sanction
Balance cost (unspent)
₹29.46 Cr
Wage₹18.22 Cr
Material₹11.24 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore