Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
18.9%
OF COST SPENT
₹43.40 L spent
of ₹2.29 Cr sanctioned
₹1.86 Cr still to spend
on 23 ongoing works
Works ongoing
23
Open the list of these works →
Sanctioned
₹2.29 Cr
Pure scheme (wage + material)
Expenditure since inception
₹43.40 L
18.9% of sanction
Balance cost (unspent)
₹1.86 Cr
Wage₹71.87 L
Material₹1.14 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr