Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
57.3%
OF COST SPENT
₹2.56 Cr spent
of ₹4.46 Cr sanctioned
₹1.91 Cr still to spend
on 107 ongoing works
Works ongoing
107
Open the list of these works →
Sanctioned
₹4.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.56 Cr
57.3% of sanction
Balance cost (unspent)
₹1.91 Cr
Wage₹96.23 L
Material₹94.55 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore