Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
0.3%
OF COST SPENT
₹1.99 L spent
of ₹7.02 Cr sanctioned
₹7.00 Cr still to spend
on 252 ongoing works
Works ongoing
252
Open the list of these works →
Sanctioned
₹7.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.99 L
0.3% of sanction
Balance cost (unspent)
₹7.00 Cr
Wage₹5.24 Cr
Material₹1.76 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost