Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
51.3%
OF COST SPENT
₹2.70 Cr spent
of ₹5.26 Cr sanctioned
₹2.56 Cr still to spend
on 181 ongoing works
Works ongoing
181
Open the list of these works →
Sanctioned
₹5.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.70 Cr
51.3% of sanction
Balance cost (unspent)
₹2.56 Cr
Wage₹64.83 L
Material₹1.91 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh