Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
40.9%
OF COST SPENT
₹64.03 L spent
of ₹1.57 Cr sanctioned
₹92.49 L still to spend
on 111 ongoing works
Works ongoing
111
Open the list of these works →
Sanctioned
₹1.57 Cr
Pure scheme (wage + material)
Expenditure since inception
₹64.03 L
40.9% of sanction
Balance cost (unspent)
₹92.49 L
Wage₹64.18 L
Material₹28.30 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh