Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
46%
OF COST SPENT
₹46.91 Cr spent
of ₹101.93 Cr sanctioned
₹55.01 Cr still to spend
on 14,879 ongoing works
Works ongoing
14,879
Open the list of these works →
Sanctioned
₹101.93 Cr
Pure scheme (wage + material)
Expenditure since inception
₹46.91 Cr
46% of sanction
Balance cost (unspent)
₹55.01 Cr
Wage₹34.88 Cr
Material₹20.14 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore