Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWell Recharge
33.3%
OF COST SPENT
₹1.09 Cr spent
of ₹3.26 Cr sanctioned
₹2.18 Cr still to spend
on 116 ongoing works
Works ongoing
116
Open the list of these works →
Sanctioned
₹3.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.09 Cr
33.3% of sanction
Balance cost (unspent)
₹2.18 Cr
Wage₹73.53 L
Material₹1.44 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore