Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
1.7%
OF COST SPENT
₹2.24 L spent
of ₹1.35 Cr sanctioned
₹1.32 Cr still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹1.35 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.24 L
1.7% of sanction
Balance cost (unspent)
₹1.32 Cr
Wage₹78.28 L
Material₹54.13 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh