Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of GP Bhawan
67.5%
OF COST SPENT
₹52.94 L spent
of ₹78.46 L sanctioned
₹25.52 L still to spend
on 10 ongoing works
Works ongoing
10
Open the list of these works →
Sanctioned
₹78.46 L
Pure scheme (wage + material)
Expenditure since inception
₹52.94 L
67.5% of sanction
Balance cost (unspent)
₹25.52 L
Wage₹9.46 L
Material₹16.06 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh