Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.8%
OF COST SPENT
₹17.34 L spent
of ₹21.10 Cr sanctioned
₹20.93 Cr still to spend
on 845 ongoing works
Works ongoing
845
Open the list of these works →
Sanctioned
₹21.10 Cr
Pure scheme (wage + material)
Expenditure since inception
₹17.34 L
0.8% of sanction
Balance cost (unspent)
₹20.93 Cr
Wage₹9.51 Cr
Material₹11.42 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore