Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
38.3%
OF COST SPENT
₹6.16 Cr spent
of ₹16.07 Cr sanctioned
₹9.92 Cr still to spend
on 653 ongoing works
Works ongoing
653
Open the list of these works →
Sanctioned
₹16.07 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.16 Cr
38.3% of sanction
Balance cost (unspent)
₹9.92 Cr
Wage₹7.55 Cr
Material₹2.37 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Ater ₹15.77 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore