Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
3.1%
OF COST SPENT
₹11.45 L spent
of ₹3.64 Cr sanctioned
₹3.53 Cr still to spend
on 610 ongoing works
Works ongoing
610
Open the list of these works →
Sanctioned
₹3.64 Cr
Pure scheme (wage + material)
Expenditure since inception
₹11.45 L
3.1% of sanction
Balance cost (unspent)
₹3.53 Cr
Wage₹3.50 Cr
Material₹2.31 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore