Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
44.1%
OF COST SPENT
₹1.03 Cr spent
of ₹2.34 Cr sanctioned
₹1.31 Cr still to spend
on 81 ongoing works
Works ongoing
81
Open the list of these works →
Sanctioned
₹2.34 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.03 Cr
44.1% of sanction
Balance cost (unspent)
₹1.31 Cr
Wage₹32.89 L
Material₹97.74 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore