Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
46.3%
OF COST SPENT
₹5.55 Cr spent
of ₹11.99 Cr sanctioned
₹6.44 Cr still to spend
on 92 ongoing works
Works ongoing
92
Open the list of these works →
Sanctioned
₹11.99 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.55 Cr
46.3% of sanction
Balance cost (unspent)
₹6.44 Cr
Wage₹3.77 Cr
Material₹2.67 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore