Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWorks for Flood Control and Protection
53.9%
OF COST SPENT
₹1.70 Cr spent
of ₹3.16 Cr sanctioned
₹1.46 Cr still to spend
on 57 ongoing works
Works ongoing
57
Open the list of these works →
Sanctioned
₹3.16 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.70 Cr
53.9% of sanction
Balance cost (unspent)
₹1.46 Cr
Wage₹92.41 L
Material₹53.27 L