Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGWorks for Flood Control and Protection
0%
OF COST SPENT
₹0 spent
of ₹28.94 Cr sanctioned
₹28.94 Cr still to spend
on 510 ongoing works
Works ongoing
510
Open the list of these works →
Sanctioned
₹28.94 Cr
Pure scheme (wage + material)
Expenditure since inception
₹0
0% of sanction
Balance cost (unspent)
₹28.94 Cr
Wage₹19.02 Cr
Material₹9.91 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore