Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
8.8%
OF COST SPENT
₹12.92 L spent
of ₹1.46 Cr sanctioned
₹1.33 Cr still to spend
on 51 ongoing works
Works ongoing
51
Open the list of these works →
Sanctioned
₹1.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹12.92 L
8.8% of sanction
Balance cost (unspent)
₹1.33 Cr
Wage₹85.60 L
Material₹47.73 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore