Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
51.5%
OF COST SPENT
₹81.61 Cr spent
of ₹158.61 Cr sanctioned
₹77.00 Cr still to spend
on 18,490 ongoing works
Works ongoing
18,490
Open the list of these works →
Sanctioned
₹158.61 Cr
Pure scheme (wage + material)
Expenditure since inception
₹81.61 Cr
51.5% of sanction
Balance cost (unspent)
₹77.00 Cr
Wage₹47.33 Cr
Material₹29.67 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block