Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
17.4%
OF COST SPENT
₹40,551 spent
of ₹2.34 L sanctioned
₹1.93 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹2.34 L
Pure scheme (wage + material)
Expenditure since inception
₹40,551
17.4% of sanction
Balance cost (unspent)
₹1.93 L
Wage₹1.64 L
Material₹28,654
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh