Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
4.7%
OF COST SPENT
₹71,965 spent
of ₹15.17 L sanctioned
₹14.45 L still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹15.17 L
Pure scheme (wage + material)
Expenditure since inception
₹71,965
4.7% of sanction
Balance cost (unspent)
₹14.45 L
Wage₹8.24 L
Material₹6.21 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh