Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
81.4%
OF COST SPENT
₹8.36 Cr spent
of ₹10.26 Cr sanctioned
₹1.91 Cr still to spend
on 41 ongoing works
Works ongoing
41
Open the list of these works →
Sanctioned
₹10.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.36 Cr
81.4% of sanction
Balance cost (unspent)
₹1.91 Cr
Wage₹59.13 L
Material₹1.32 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

No works match these filters.