Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
45.2%
OF COST SPENT
₹76.70 L spent
of ₹1.70 Cr sanctioned
₹93.08 L still to spend
on 30 ongoing works
Works ongoing
30
Open the list of these works →
Sanctioned
₹1.70 Cr
Pure scheme (wage + material)
Expenditure since inception
₹76.70 L
45.2% of sanction
Balance cost (unspent)
₹93.08 L
Wage₹65.79 L
Material₹27.29 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh