Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of GP Bhawan
23.7%
OF COST SPENT
₹22.44 L spent
of ₹94.53 L sanctioned
₹72.10 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹94.53 L
Pure scheme (wage + material)
Expenditure since inception
₹22.44 L
23.7% of sanction
Balance cost (unspent)
₹72.10 L
Wage₹10.37 L
Material₹61.72 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh