MGNREGAConstr of Cement Concrete Roads
62.1%
OF COST SPENT
₹2.17 L spent
of ₹3.50 L sanctioned
₹1.32 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹3.50 L
Pure scheme (wage + material)
Expenditure since inception
₹2.17 L
62.1% of sanction
Balance cost (unspent)
₹1.32 L
Wage₹1.32 L
Material₹0
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L