Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
57.7%
OF COST SPENT
₹18.60 Cr spent
of ₹32.24 Cr sanctioned
₹13.64 Cr still to spend
on 928 ongoing works
Works ongoing
928
Open the list of these works →
Sanctioned
₹32.24 Cr
Pure scheme (wage + material)
Expenditure since inception
₹18.60 Cr
57.7% of sanction
Balance cost (unspent)
₹13.64 Cr
Wage₹3.40 Cr
Material₹10.24 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type