Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
34.3%
OF COST SPENT
₹4.73 Cr spent
of ₹13.77 Cr sanctioned
₹9.04 Cr still to spend
on 211 ongoing works
Works ongoing
211
Open the list of these works →
Sanctioned
₹13.77 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.73 Cr
34.3% of sanction
Balance cost (unspent)
₹9.04 Cr
Wage₹6.16 Cr
Material₹2.89 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore