Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
37.7%
OF COST SPENT
₹3.78 Cr spent
of ₹10.02 Cr sanctioned
₹6.24 Cr still to spend
on 279 ongoing works
Works ongoing
279
Open the list of these works →
Sanctioned
₹10.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.78 Cr
37.7% of sanction
Balance cost (unspent)
₹6.24 Cr
Wage₹3.68 Cr
Material₹2.56 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore