Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
0.9%
OF COST SPENT
₹7.22 L spent
of ₹8.32 Cr sanctioned
₹8.25 Cr still to spend
on 115 ongoing works
Works ongoing
115
Open the list of these works →
Sanctioned
₹8.32 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.22 L
0.9% of sanction
Balance cost (unspent)
₹8.25 Cr
Wage₹6.67 Cr
Material₹1.59 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
BURHANPUR — KHAKNAR ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore