Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
70.1%
OF COST SPENT
₹1.64 Cr spent
of ₹2.34 Cr sanctioned
₹69.89 L still to spend
on 112 ongoing works
Works ongoing
112
Open the list of these works →
Sanctioned
₹2.34 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.64 Cr
70.1% of sanction
Balance cost (unspent)
₹69.89 L
Wage₹62.20 L
Material₹7.69 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore