Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
52.2%
OF COST SPENT
₹1.11 Cr spent
of ₹2.13 Cr sanctioned
₹1.02 Cr still to spend
on 346 ongoing works
Works ongoing
346
Open the list of these works →
Sanctioned
₹2.13 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.11 Cr
52.2% of sanction
Balance cost (unspent)
₹1.02 Cr
Wage₹1.00 Cr
Material₹1.62 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh