Data as of 29 Oct 2026, 06:52 Admin login
FY
Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.2%
OF COST SPENT
₹4.65 L spent
of ₹19.73 Cr sanctioned
₹19.69 Cr still to spend
on 293 ongoing works
Works ongoing
293
Open the list of these works →
Sanctioned
₹19.73 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.65 L
0.2% of sanction
Balance cost (unspent)
₹19.69 Cr
Wage₹12.35 Cr
Material₹7.33 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore