Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
7.7%
OF COST SPENT
₹43,320 spent
of ₹5.59 L sanctioned
₹5.16 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹5.59 L
Pure scheme (wage + material)
Expenditure since inception
₹43,320
7.7% of sanction
Balance cost (unspent)
₹5.16 L
Wage₹1.87 L
Material₹3.29 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh