Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
0%
OF COST SPENT
₹0 spent
of ₹1.46 Cr sanctioned
₹1.46 Cr still to spend
on 51 ongoing works
Works ongoing
51
Open the list of these works →
Sanctioned
₹1.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹0
0% of sanction
Balance cost (unspent)
₹1.46 Cr
Wage₹98.52 L
Material₹47.73 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore