Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of NADEP/Vermi Compost Pit
31.6%
OF COST SPENT
₹1.01 Cr spent
of ₹3.19 Cr sanctioned
₹2.18 Cr still to spend
on 341 ongoing works
Works ongoing
341
Open the list of these works →
Sanctioned
₹3.19 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.01 Cr
31.6% of sanction
Balance cost (unspent)
₹2.18 Cr
Wage₹60.20 L
Material₹1.58 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh